How is it done?

patThe process we follow is as follows:

Step 1 Visual Inspection Your equipment will be visually checked for any defects such as overheating marks and breakages.

Step 2 We will open the plug top to ensure the right size of fuse is installed and that the terminations are tight enough.

Step 3 We will do a series of electrical tests to confirm continuity of earthing and the integrity of the wiring.

Step 4 The equipment will be labelled based on the result of the test. If it passes a green label will be used, and a red label if it fails.

Step 5 All results will be recorded and a certificate will be emailed to you within one working day after payment is received. A printed copy can be made available for an additional cost of £3 for the first 2 pages and 20p for every additional page.